Rob E wrote:b33fy wrote:Facial, soffit and barge boards done on one roof along with a bit of decking. Rain stopped play fortunately for James..
Have you thought about rainwater beef ? I’m sure you have but we normally hang the osb over by 50mm then screw batten through this to form part of the drip ready for the torch on, you can nail/screw straight on to what you have I just like a bit of extra strength, looks great though, I’ll pop a pic up of what I’ve been doing on weekends in lockdown
Thanks Rob, good point, awaiting some more ply to finish off the facia’s etc. Putting a rubber roof on which is supplied with appropriate trims. The higher roof will have upstands all round except the gutter side.. A batten will be fitted along the lower edge as part of the drip then a gutter trim fitted to that. Lower roof will be similar though the top edge will have a flashing trim fitted.
Hope that make sense Rob, not great with the terminology.
A little more progress, a few odd jobs done including trimming the tops of the centre posts.
Power.. small nail, fast hammer, Torque.. small nail, big hammer.. I got a big hammer